FAQ · Le Comptoir Éolien
Procedures and regulations
Identify the procedures and checks to be carried out according to the location and type of your installation.

Choose a question to display its answer. The instructions in the model's manual should still be checked for your installation.
Assistance and taxation
What is the tax credit for wind turbines?
The aids and tax advantages depend on the country, the current system, the equipment, the installation, and the applicant's situation. Do not assume that a renovation aid finances a wind turbine. Check your eligibility with the competent organizations before ordering; no former tax credit should be assumed as a current right. Useful links: advice & info.
Enedis and self-consumption
Are self-consumption wind turbine kits compatible with a Linky meter?
The Linky meter is not, by itself, the compatibility criterion. The installation must primarily use a wind-compatible injection inverter, equipped with the required safety functions, and comply with the connection scheme and applicable procedures. Check the compliance and exact characteristics on the kit's datasheet before ordering. Learn more: ERDF self-consumption wind kits 230V/230V.
Do I need to declare a self-consumption wind installation to Enedis?
A production connected in parallel to the grid must be examined according to its scheme, power, the inverter used, and the grid manager's rules. A declaration, a self-consumption agreement, or other procedures may be necessary. Before commissioning, check Enedis requirements, the inverter's anti-islanding compliance, and obligations related to your existing installation. Le Comptoir Éolien cannot confirm remotely that no procedure is required. Learn more: Administrative procedures for installation.
Can I add a wind turbine if I already have solar with surplus sales?
A wind turbine can technically be added with an independent conversion chain, but its integration must be verified with regard to the existing solar contract, the metering scheme, and Enedis or EDF OA rules. Do not connect the wind turbine to the solar inverter's PV input. For the grid, use a dedicated wind solution; for storage, use a wind regulator compatible with the battery park. Learn more: Hybrid self-consumption kits.
Can the surplus produced by a small wind installation be sold?
The sale is not automatic with a kit intended for self-consumption. It requires a contract, a connection scheme, and equipment accepted by the energy buyer and the grid manager. For a small installation, the usual goal is to reduce instant consumption. Check the contractual conditions before sizing a surplus sales project. Learn more: Administrative procedures for installation.
Enedis and connection
Self-consumption 230V: what needs to be installed behind a domestic wind turbine to inject into my Enedis network?
Choose an injection chain explicitly compatible with the generator and your network. Some wind inverters directly accept three AC wires and provide the intended control, rectification, and protection functions; other architectures require separate components. Do not remove a regulator or load shedding without the model's manual. Check anti-islanding and connection procedures before commissioning. Useful links: wind inverters 230 V · ready-to-inject wind network kits.
How to stop the production of a grid-connected wind turbine (EDF cut-off or voluntary stop)?
A compliant grid inverter interrupts injection when the grid disappears. This does not guarantee the mechanical stop of the rotor. For a storm or maintenance, apply the manufacturer's shutdown and safety procedure. A compatible switch must be wired according to its scheme; simply opening the phases can remove the load and does not constitute universal braking. Useful links: 3-phase AC switch · see here.
How is the electrical connection made between the rotating part and the mast on the AIR-SIDE 2000W 48V kit reference 15717?
On the AIR-SIDE 2000W 48V kit reference 15717, the mast head connection uses a slip ring and not a user-accessible brush system. The conductor connections must be made reliably, with a properly insulated tin solder or equivalent quality electrical connector, suitable for vibrations, humidity, and weather conditions. We do not have additional technical photos beyond the information published on the product sheet and the manual provided with the equipment. Learn more: Air-Side 2000W 48V domestic wind kit.
Do I need to inform EDF if I install a plug-and-play kit?
Check the procedures with the competent grid manager for your installation, its power, and its operating mode. An agreement or declaration may be necessary even for a plug-in kit. A contract with an electricity supplier does not replace connection requirements; confirm the applicable procedure before commissioning. Learn more: Administrative procedures for installation.
1000W Wind Turbine 120V Output + Inverter "dumpload start 200V": connection?
We do not sell wind inverters with a DC input of 120–200 V. Our range operates in 3-wire AC (12/24/48 V) on the generator side. For a 120 V DC machine, contact the inverter manufacturer for setting the load-shedding threshold or consider a low-voltage architecture (48 V generator + 230 V wind inverter). See 230 V wind inverters.
I already have an EDF contract and an "unlocked" Linky. How to add a wind turbine?
Add a wind self-consumption kit: the inverter injects in parallel with your PV. For official resale, contact Enedis/EDF. Choose according to your network (single/three-phase). Browse network kits and injection inverters. Rules may vary depending on the municipality, PLU, subdivision, protected areas, and connection scheme. Check your situation with the town hall and, for network injection, with Enedis or the relevant contractual contact.
1500W Wind Kit: do I need to inform EDF?
Check urban planning rules separately with the town hall and connection requirements with the network manager. A power of 1,500 W or a plug connection does not automatically exempt you from procedures. Confirm the connection scheme, inverter compliance, and obligations related to existing production before commissioning. Useful links: Administrative procedures.
Does the Storage MPPT 500W / 24V self-consumption inverter properly cut off in case of a network outage (EDF / Enedis)?
A grid injection inverter must stop injection during a power outage thanks to anti-islanding. For the concerned Storage MPPT, check this function and the compliance documents of the exact reference. Do not infer the application of a standard from a range name. A backup power function should only be assumed if explicitly provided. Useful links: grid injection inverters.
Can you completely disconnect from EDF with a wind turbine?
Complete autonomy requires an energy assessment considering wind and solar variability, consumption, losses, storage, and unfavorable periods. A single wind turbine does not guarantee continuous power supply. Have an off-grid compatible architecture sized and plan for backup needs; a generic percentage of losses is not enough. Useful links: advice & info.
What is an Enedis wind kit for self-consumption?
A wind turbine + inverter set that injects at 230 V into your domestic installation, to prioritize your production consumption. See: 230 V network kits. Rules may vary depending on the municipality, PLU, subdivision, protected areas, and connection scheme. Check your situation with the town hall and, for network injection, with Enedis or the relevant contractual contact.
What is the best electrical connection method for a wind turbine?
Use the prescribed connection method for the reference: terminals, connectors, or joints suitable for current, conductors, vibrations, and exposure. Provide for insulation, moisture protection, and mechanical retention. Tin soldering is not universally the most reliable solution; have the connection validated by a competent person. Learn more: Administrative procedures for installation.
What protections and connection rules should be planned for injection via 12V batteries?
On the battery side, size the DC protections, cables, and disconnection according to the maximum current and instructions. On the network side, check the circuit, protections, anti-islanding, and procedures applicable to the exact inverter. A 16 A rating or type of differential should not be chosen without validation of the scheme by an electrician. Useful links: injection inverters.
Who can perform the three-phase connection (3 inverters)?
A qualified electrician. Plan for 3 protected outputs on the panel (circuit breakers) and grounding of the mast/structures. Learn more: Administrative procedures for installation.
Is there any regulation preventing the installation of a wind turbine?
Installation possibilities depend on height, plot, protected areas, PLU, and other local rules. The 12 m threshold is a reference in France, but a lower installation is not automatically exempt from verification. Ask the town hall for procedures suited to your project and separately check network connection rules. Useful links: administrative procedures.
Standards and compliance
Certificates of compliance for a wind turbine with MPPT regulation and a hybrid inverter?
Compliance and certificates must be verified for the exact reference. Consult the product sheet and the documents actually published or provided with the equipment; do not assume that a certificate applies to an entire range. Learn more: Wind + Solar Hybrid Kits.
Is the 700W kit Linky compatible and compliant (anti-islanding)?
Compliance and certificates must be verified for the exact reference. Consult the product sheet and the documents actually published or provided with the equipment; do not assume that a certificate applies to an entire range. Learn more: Grid-tie Inverters.
Storage MPPT Inverter 500W 12V→230V: DIN VDE 1026 certificate?
Compliance and certificates must be verified for the exact reference. Consult the product sheet and the documents actually published or provided with the equipment; do not assume that a certificate applies to an entire range. Learn more: Inverters.
What compliance and connection obligations should be anticipated for 55kW?
Compliance and certificates must be verified for the exact reference. Consult the product sheet and the documents actually published or provided with the equipment; do not assume that a certificate applies to an entire range. Learn more: Grid-tie Inverters.
Is a compliance certificate available for the Storage MPPT Inverter 500W 12V to 230V?
Compliance and certificates must be verified for the exact reference. Consult the product sheet and the documents actually published or provided with the equipment; a certificate should not be assumed valid for an entire range. When a document is not published or available separately, Le Comptoir Éolien cannot guarantee its transmission. Learn more: Inverters.
Resale and contracts
Do you offer a grid-connected wind kit with batteries to store the surplus?
Yes, some configurations combine a wind turbine, a regulator, a battery bank, and an inverter with grid injection or 230 V power supply. Depending on the models, the kit can be offered with or without a mast and in 24 V or 48 V. The exact content, storage capacity, and surplus operation must be verified on the product sheet. A battery cannot be directly added to a standard grid kit that is not designed for storage. Learn more: Self-consumption Hybrid Kits.
What happens to the surplus produced by a 700W self-consumption kit?
The production first supplies the current consumption on the installation. If it exceeds them, a surplus can be injected into the grid depending on the configuration. Its limitation, possible storage, and contractual handling must be arranged with the grid operator; it does not automatically entitle you to remuneration. Learn more: Advice.
At what rate can photovoltaic production be sold?
The rate, eligibility, and contract duration depend on the applicable regulatory framework, the date of the complete application, the power, and the type of installation. They evolve and should not be deduced from an old schedule. Check the current conditions with the grid operator, the concerned buyer, and official sources before starting the project. Learn more: Administrative procedures for installation.
Urban planning and town hall
What administrative procedures should be checked before installing a domestic wind turbine?
The formalities depend notably on the total height, the PLU, the subdivision, the neighborhood, and any possible protected area. In France, the 12 m threshold is an important benchmark, but a lower height does not automatically exempt you from checking local rules. Consult the PLU and inquire at the town hall before the work. • Check easements, protected areas, and co-ownership or subdivision rules. • Beyond the applicable thresholds, an urban planning authorization may be necessary. The town hall remains the contact point for your plot. Learn more: Administrative procedures for installation.
For a Vector domestic wind turbine, what installation regulations should I anticipate (mast height, town hall procedures)?
For a Vector wind turbine as for another model, check with the town hall the rules related to the plot, the total height, the PLU, and protected areas. The 12 m benchmark does not automatically exempt a lower project from procedures. Also validate the mast, anchors, and grid connection obligations before work. Useful links: Administrative procedures · masts for wind turbines.
Need advice on a reference?
Specify the relevant references and the characteristics of your installation to customer service.

